OPAM 2009


Total in 2009: 116 project

Januar:
One Shoebag
Two pillows
One short tablerunner
One Christmas mystery tablecloth
Five pair of potholders
One music tote
Total in January: 11 project.

Februar:
6 pencilhouses
Two quilts in flanell
One little quilt to sit on.
One tablecloth with 12 stitcheries
One bag
One makeup purse
Total in February: 12 project.

Mars:
Two stitchery-keepers
Set of four placemats
Total in March: 3 project.

April:
One flanel quilt
One knitted tunic
One Easter tablerunner
Two small runners for Easter
One large bag
One pair of socks
So far in April: 7 project

Mai:
One babyquilt
One birdpicture
Noahs Ark
Mirandas Day Bag
One shopping bag
3 small bags
2 bags, summer of 1970's
Total in May: 10 project.

June:
Two shopping bags
Two tablerunners
One stitchery from Little Chicken Feather
Total in June: 5 project.

July:
One croched sleeveless cardigan
Two bags made from squares
One bedquilt for my doughter
Three tablerunners
One tablecloth
One pair of potholders
Total in July: 9 project

August:
One knitted skirt
Total in August: 1 project.

September:
Nine toiletpurses
Total in September: 9 project.

October:
4 pair of potholders
1 little bag
4 bags with stitchery
1 tabelrunner
2 small tableclothes
3 toiletpurses
Total in October: 15 project.

November:
One adventcalender
Two advent tablerunners
two advent tableclothes
Five small toiletpurses
One notebookcover
Total in November: 11 project.

December:
One circular christmas tabletopper
2 knitting needle cases
5 cases for circular knitting needles
6 scissor cases
One Advent tablerunner
3 Christmas cards
4 chinese scarves
One shawl
Total in December: 23 project